BuildOrch
Risk Register

See the risks before they bite.

Log every project risk with probability and impact, watch them land on a live heat-map, and track each mitigation through to closure — with an AI analyst suggesting the next move.

app.buildorch.io / risk-register
Risk Register — BuildOrch
P × I
live probability × impact heat-map
Mitigations
tracked from open to closed
Portfolio
shared risk patterns across projects
What it gives you

Risk, made visible and accountable.

Not a static spreadsheet — a living register where every risk has an owner, a score and a plan.

🗺️Probability × Impact mapInherent and residual exposure on a colour-coded heat-map.
🛠️Mitigation trackingEvery risk carries a mitigation, an owner and a status.
🔢Risk scoringConsistent scoring so the biggest exposures rise to the top.
👤Owner & statusClear accountability — who owns it, where it stands.
🌐Portfolio rollupSee exposure across the whole book of work, not one project.
🕓Full historyEvery change to every risk, captured over time.
BuildOrch AI · Risk Analyst

Every risk, met with a move.

A risk with no mitigation is just a worry. The Risk Analyst suggests mitigations drawn from how similar risks were handled before, calibrates probability and impact from history, and spots patterns repeating across your portfolio — so nothing festers.

  • Suggests mitigations from similar past risks
  • Calibrates probability & impact from history
  • Surfaces shared risk patterns across projects
  • You review and accept — it never decides for you
✨
Risk Analyst · suggestions
Reviewed 12 risks · flagged 7 high & critical · drafted mitigations for review.
Summer midday work-hour banMitigation drafted
Module transport weather windowRe-sequence suggested
Curtain-wall package long-leadExpedite + buffer
Subcontractor capacity shortfallProbability ↑ from history
✓ Accept & add mitigations

Get ahead of what could go wrong.

We'll set up your register, heat-map and the AI Risk Analyst on a real project's risks.