Hand over a building, a floor or a system on its own timeline: clear the snags, capture the sign-offs, attach the documentation and record the date that starts the defects liability clock.
Each section carries its own snag list, approvals and evidence — so handing over early never means handing over undocumented.
Outstanding items per section, assigned, tracked and cleared before sign-off.
Gated approval on the handover, with a branded, traceable certificate.
Drawings, certificates, warranties and O&M attached to the section they belong to.
The handover is the moment the contractual clock changes — so BuildOrch records it precisely.
Branded, approved and tied to the section it covers — issued on your Legal Entity’s letterhead with its address, registration and TRN already on it.
It names the project, the section and the certified date, carries the DRAFT mark until the approval is complete, and lists the works being taken over. That date is the one the defects liability period is counted from.
Every section closed, evidenced and signed.