Project WBS turns an awarded estimate into a structured, schedulable plan — a phased work-breakdown tree with cost-loaded lines, real dates and a live Gantt. It's the backbone every control in BuildOrch is built on.
One work-breakdown structure — read as a tree, a schedule, a cost sheet or a Gantt, baselined and feeding every control downstream.
Building a work-breakdown structure by hand — every phase, every task, then hunting down the cost for each line — burns hours before the job even starts. The AI WBS Composer reads your awarded estimate and drafts the whole structure in one click: phases, work packages, and every cost element already mapped in. Hours of structuring, done in seconds.
The Composer drafts; you decide. Inspect the full schedule and cost it generated — durations, predecessors, start and finish dates — flip between Summary and Detailed views, then Confirm & Add to WBS. Nothing touches your plan until you say so.
Organise the project into phases and work packages, set durations and dependencies, and track percent-complete to the data date — all in one structured tree, not a sprawl of spreadsheets.
Project WBS inherits the cost of the awarded estimate line-for-line, then rolls it up by phase and work package — so the plan you schedule and the budget you defend are the same numbers.
A live Gantt renders straight from the WBS — phases, work packages, milestones and the critical path — so anyone can read the shape of the project in seconds.
We'll show you how an awarded estimate becomes a scheduled, cost-loaded plan — and the backbone for every control that follows.