Raise interim payment certificates straight from measured progress — previous, this period and cumulative — with retention, advance recovery and approved variations handled, and every claim gated and branded before it leaves the building.
Progress is measured against the WBS, the claim is built from that measurement, and the numbers carry straight through to certification.
Every line shows what was claimed before, what is claimed now, and the running total — the format your QS expects.
Retention held and released, advance payment recovered — calculated on the certificate, not on the side.
Approved variations flow into the claim so the contract value always reconciles.
A claim is a controlled document: it needs approval before issue, it freezes on submission, and the certificate carries your identity.
Role-based approval before a claim can be certified or sent.
Your logo, entity details and TRN on every issued document.
Every revision of every claim, kept and comparable.
Branded, itemised and traceable back to measured work.
Every certificate traceable back to measured work.